Every since "Raising The Bar" announcement of vSphere 5 and its associated changes, the blogosphere has been running rampant about Licensing both for and against. Some of the blog postings I see make some good points like CPU core count is no longer a metric to care about with VMware. There's opinions on every side of the fence on this topic. The one thing I haven't seen is a discussion around companies that have already hit the 80+% virtualized space. How does this licensing change affect them now that they are going after big hitters and larger systems such as SharePoint 2010, Exchange 2010 and tools like Autonomy or Lync?

I've been running the numbers of my environment and the initial numbers look good for the current time.

Counting physical cpu's and vRAM in your environment....
======
pCpu Count: 364
vRAM (GB): 7104
======
Resulting license options:

Edition Entitlement Licenses
------- ----------- --------
[...]Standard 1 pCpu + 24 GB vRAM 364 with 1632 GB vRAM overhead
Enterprise 1 pCpu + 32 GB vRAM 364 with 4544 GB vRAM overhead
Enterprise Plus 1 pCpu + 48 GB vRAM 364 with 10368 GB vRAM overhead


Let's cover the assumptions going forward into this post.

  • Every socket that runs ESXi must have a corresponding license even if you don't need the vRAM
  • vRAM is only counted as allocated for Powered On VMs


Through much work, my environment has hit close to 87% virtualized for x86 workloads. We have eliminated all the low hanging fruit of 1 or 2 vCPU and <8G of RAM machines. The new systems coming in on average are 4-8 vCPU and 16-32G of RAM minimum as they are bigger efforts and larger projects in general. In one case they were seriously debating putting the project on hold to wait for vSphere 5 and the 12+ vCPU sizing.

That being said, I'll cover some numbers in just a large discussion point view. If there's interest I'll look at going into each of these unique projects in more detail in later blog posts.

Exchange 2010


This environment is looking at deploying 14 hosts total with 66 VMs spread across multiple campuses.

  • 14 Hosts with 256G of pRAM and 4 sockets each.
  • Each VM is allocated 32G of vRAM.
  • Host Clusters are setup at a 4+1 HA configuration.
  • Dedicated Host Cluster for this application deploy.


This sets up this situation...

14 Hosts with 4 sockets each = 56 sockets of Enterprise+
56 sockets of Enterprise+ * 48G of vRAM per Enterprise+ = 2,688G of vRAM available

66 VMs at 32G of vRAM each = 2,112G of vRAM needed


The results of this means that the environment has a surplus of 576G of vRAM to share out. No difference in pricing between deploying on vSphere 4 or vSphere 5.

Autonomy


This environment is looking at deploying 10 hosts total with 60 VMs.

  • 10 Hosts with 384G of pRAM and 4 sockets each.
  • Each VM is allocated 48G of vRAM.
  • Host Clusters are setup at a 4+1 HA configuration.
  • Dedicated Host Cluster for this application deploy.


This sets up this situation...

10 Hosts with 4 sockets each = 40 sockets of Enterprise+
40 sockets of Enterprise+ * 48G of vRAM per Enterprise+ = 1,920G of vRAM available

60 VMs at 48G of vRAM each = 2,880G of vRAM needed


The results of this means that the environment has a deficit of 960G of vRAM. This is the same as needing to purchase 20 more licenses of Enterprise+ to make up the vRAM difference. At the list price of $3,495 (before discount) it will add $69,900 unless the environment can make up this difference.

This project is a hard sell to be virtual and this additional $70k would have pushed the project to go physical as it would have ultimately been cheaper in the initial capital costs.

Summary


Depending on the project and how much older hardware is available in the environment today, vRAM isn't something to fret about today. In the future this will offer up some challenges to justify making something that should run just fine as a virtual into a VM. OS instances only get larger as we go into Tier 1 type of applications. VMware needs to weigh getting a tad bit more revenue over having ideal case studies like this environment available of over 90% virtual. They can address this by raising up the vRAM on the high end licenses to 64G+ of vRAM, allow me to buy vRAM increments or make an ELA be reasonably priced enough to keep the physical-lovers at bay. If VMware is happy with companies just going to 80% then they are there. If they want to get to the Tier 1, business stopping, critical applications in the larger corporations, they need to consider how to not have the vRAM be a detriment to internal discussions.

Continue reading »

100k vMotions in Production

I logged into the environment and was checking some things out and we just recently broke a rather important milestone.

In our production environment one of our oldest clusters just broke 100,000 vMotions (or more accurately since they aren't at ESXi 4.1U1 yet, VMotions).

100k vMotion Summary This cluster has weathered the ups and downs of a functional vSphere cluster with hosts going into an out of Maintenance Mode, Hardware failures and general maintenance. This cluster we had over allocated on CPU for a couple months per our standard policy, though we got no real complaints about performance there. We have since updated that policy and I'm sure the number of vMotions has slowed down somewhat.

Just proof that vMotions/DRS & the entire vSphere solution is valid and solid. Here's to another 100k vMotions.

Continue reading »

Maybe its time for a new job.

I got back from a 10 day vacation where I was completely disconnected from work. The work emails started getting downloaded and the initial filter went through them.

666 emails in the inbox

I have 666 unread ones in my inbox. Maybe its time to think about another job.

Continue reading »

Back after a long run

I know it has been a very quiet set of months here. Life has thrown me a couple curve balls and I've had to make tough choices on what gets use of my time. I've got many a posts coming so thanks for hanging out and keeping me in your blog rolls.

Continue reading »

I'm on the list of Virtualization Blogs. Woot!

Eric Siebert, of vSphere-land.com fame, has published the Top 25 blog list of 2010. If you look through the list there is some awesome bloggers out there. I take great pride in having met some of them at VMworld and VMUG events and look forward to more interactions with all these brilliant thinkers and communicators.

Congrats to all the excellent information sharers out there. You have all earned it.

On my side I am super ecstatic that I had 20 people vote for me. Thank you to all the readers of this blog.

http://vsphere-land.com/news/top-vmware-blogger-results.html

Continue reading »
Top